On March 22, 2019, the reactor of the second unit of the Novovoronezh NPP-II nuclear power plant has reached the minimum controlled output. It is already the third VVER-1200 III + reactor. Achieving the minimum controlled performance can be referred to as the “heart of the block”, a nuclear reactor. It opens the way to … Continue reading In Novovoronezh NPP-II, the heart of Unit 3 of III + generation has begun to beat in Russia
© 2005-2024 ARAKO spol. s r.o., All rights reserved | Webové stránky od AiVision s.r.o.